second waste plastics road in nepal
Road making right now in Kirtipur Gate is made up of the waste plastics ( especially noodle, chocolate, junk food packings ) with shredding. This is the Second one in Nepal after Pokhara. this is very good step in waste management and recycling the wastes.
(adsbygoogle = window.adsbygoogle || []).push({});
Green Road Waste Management introduced plastic into the traditional bitumen mixture, reducing the amount of expensive asphalt concentrate to make cheaper, longer-lasting and environmentally friendly roads.
The plastic waste is first processed into pellets, then boiled at 160 Celsius with other components including asphalt. Of the 2,475 litres of bitumen used in the blacktopping of Anupam Marg, up to 16% was plastic and cost only Rs20,000.
plastic road

1 Comment
is it sustainable?
What is the minimum strength and life expatancy of these roads??